单翼双翼跌落试验台Droptestrig
Use equipment: drop tester through free fall of transport packages vertical impact test for in electronics packaging drop, drop plastic packaging, drop toy product packaging and other packaging products drop.
Main technical parameters of the equipment specification material:
model | Specimen size(mm) | Panel size(mm) | Outline dimension(mm) |
TY/-DL-315 | 1000**800*1000 | 1700*1200*20 | 1700*1200*2515 |
TY/-DL-320 | |||
TY/-DL-325 | |||
Note: load material for other sizes can be customized according to requirements, equipment in kind prevail, the experimental data are in 25 DEG C no-load conditions measured | |||
Construction | |||
Maximum test weight | 100kg | ||
texture of material | steel plate | ||
Net weight(kg) | 400kg | ||
dynamic system | Using synchronous motor, speed accuracy. Electric drop, easy to use, large acceleration. | ||
test principle | |||
| Lift the test sample to a predetermined height, and then make it free fall, and the impact table. | ||
Yi Ting instrument control system | |||
control | Digital control | ||
protect | The drop test bed is equipped with an automatic limit protector to prevent the equipment from damaging. | ||
electric machinery | Frequency conversion motor | ||
other | |||
Power Supply | 220v50Hz0.85KW | ||
power | 0.85KW | ||
Meet the standard | GB/T4857.5-92ISO2248-1972(E) |
(The appearance of information technology products are subject to change without notice, Ting Yi has the power of final interpretation)
Yi Ting drop test machine configuration strong high price | |||
. the machine can be on the package surface, corner, edge free drop test, equipped with digital display instrument and the high tracking using decoder to accurately products fall are highly, and preset drop height error is less than 2% or 10 mm. The machine with single arm and double column structure, with electric reset, electronic drop and electric lifting device: easy to use; unique hydraulic buffer device greatly improves the use of life, stability and safety of single machine settings, can be easily placed products, drop impact angle and bottom plane angle error is less than or equal to 5. | |||
Two. The main column is made of special high quality steel, the outer round grinding processing, the appearance of chrome, solid and durable and never rust Taiwan st special custom chain real faces, edges and corners of the drop test of electric reduction, electric control drop and electric lifting device, easy to use to ensure free separation of goods carrier and package, packaging test piece of free fall, small impact vibration, stable and reliable Configuration of digital display height display and the use of the decoder for a high degree of tracking, which can accurately give the product drop height and the default drop height error is not more than 2% or 10mm | |||
Three. Test height: 40-170cm Test space: 80 * 60 * 40~170cm Height to run: the use of motor drive Height control: the use of limit control, to reach the set height after automatic Stop with rising, falling, automatic stop function Drop test: pneumatic control Impact plate: 1200 x 1200 x 90mm, steel plate thickness of 8mm, the bottom of the multi bar structure, so that the impact of any 100mm2 on the surface of the area under the static load of 10kg, its deformation is not more than 0.1mm Maximum bearing weight: 150kg Other: the machine needs to be placed on a level and there is a certain strength of the platform installation and positioning. | |||
Four. / Schneider / CHINT and other well-known Delixi electrical components Performance is stable and unparalleled, long and durable to prevent the problem of circuit | |||
Safety and rest assured that all kinds of protection systems do not have to worry about hidden dangers Equipped with alarm, leakage protection, line fuse and all - sheathed terminal |
Using site environment
The following equipment is Ting test equipment.
Please do not use this equipment for the purpose of testing and other materials.
- please complete the installation environment.
Please put it under room temperature.
A place of low humidity. (80% without dew)
Places where dust and dust are low.
- please install test materials according to the requirements.
According to the requirements of the installation of test materials, or may not be expected to failure.
- for wiring and maintenance work, please be sure to turn off the power.
In order to prevent the machine in the process of losing control and lead to accidents and electric shock, before the operation, be sure to turn off the power supply.
- power
For the power of the equipment, please note the following.
The power on and power engineering, and electrical engineering personnel please or equivalent knowledge of the people concerned.
The power line
Please be sure to use the power cord supplied with the equipment. Find the power line and the power plug is abnormal, please contact with the court tomorrow. Guide for replacement or replacement of the same service personnel Ting yi.
- fuse
In order to prevent the damage of the fire and the internal circuit, please do not use the provisions of the fuse. When replacing the fuse, use the same type and shape of the fuse as the original equipment.
- special warning: warning, the application should pay attention to the implementation of the conditions or have high risk, may lead to injuries
In order to prevent accidents, on the move and use of equipment, please observe clearly, then carry out the action.
Maintenance considerations and methods:
A,
The specimen can be free to choose the surface, edge and corner of the three state drop test
The drop height can be preset, when rose to a preset height as the automatic positioning of specimen
"On the release mechanism of free and flexible, reliable, and ensures a release moments and free fall on the way from any external influence, so as to ensure that the specimen required sag state.
The scientific and reasonable structure, safe and reliable use, slope impact test rig
The transport package for Taiwan oblique impact test
Two,
1, wiring: random incidental power line connected with a three-phase power supply and grounding, the control box and a testing machine with random with; links to plug adapter situation connected, and try to run up / down command. (if the trial operation appear according to the increase in bond is run down or press down key is rising, just in the power exchange phase can;
2, fall height adjustment:
3, the object will be measured on the working table, and then fixed with a fixed rod;
4, according to the rising key to the measured object to set the height;
5, according to the drop key to make the work table instantly out of the object, the object is measured to do free fall movement;
6, press the reset button to restore the working state;
7, if repeated trials, repeat the above steps;
8, after the test: press the key to reduce the working table to the lowest position to close the power button.
Three,
1 every time the test is completed, the drop arm down, to avoid long time reduction and drop arm to spring tension deformation, impact test results, please re position the motor stops rotating before the drop drop before each key press;
2 new machines to the factory after the installation is completed, must be in the sliding rod at appropriate low concentration of oil, no rust oil or high concentration oil and backlog with corrosive oil).
3 if at the time there is too much dust please keep the machine down to low, wipe the end before the oil re oiling machine;
4 the lifting shaft of the testing machine and the chain should be lubricated regularly.
5 gear reducer for oil once every six months.
6 non work should be cut off all the power and ensure the lifting shaft clean.
7 non operating personnel shall not operate the machine